Demolition services in Windsor? Daily excavation safety inspections are ideally conducted before shift starts and, as deemed necessary, during work. Replace your paper-based excavation inspection forms with these free digital excavation templates you can use with iAuditor by SafetyCulture, a powerful mobile inspection app used in the construction industry. Take photos of excavation hazards, schedule inspections for your officials in the field, and generate PDF reports in real-time on your smartphone.

No matter how organised or experienced you are, renovating is a stressful and time consuming process, so unless a project is guaranteed to give you either your dream home, or make you money, you are taking on the wrong property. You want to renovate, not rebuild. At auction, novice investors sometimes ‘buy blind’. But more experienced and savvy builders will often commission a preliminary survey to flag up hidden dangers, defects and structural botches, works where consent should have been obtained (but may not have been), as well as location risks such as obscure rights of way, flooding and radon.

Workers and work equipment can fall into an excavated area. When possible, install a barrier and safety signage around the perimeter of the excavation to clearly mark the fall hazard. Falling loads, such as jobsite equipment or excavated dirt, can also fall into a trenched area and crush anybody who is working below. This is why OSHA requires jobsite materials to be stored at least two feet away from the edge of an excavation. Additionally, OSHA recommends that employers do not allow work to be conducted beneath suspended or raised loads. Read extra info on Construction services Windsor.

Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.DON’T forget to allow for drainage. Groundwater is the natural enemy of retaining walls. When it saturates clay-type soils, they swell and put excessive pressure on the backside of the wall. To avoid failure, make drainage provisions at the same time as you go about building the retaining wall. Backfilling the space behind the blocks with crushed stone and then installing a flexible perforated drainpipe (available at The Home Depot), also called “drain tile,” at the base of the wall could create the necessary escape route for groundwater. The perforated pipe will carry groundwater to each end of the wall where it can drain harmlessly away. The ends of the drainpipe should then exit on each end of the wall, and you may cover them with crushed stone to camouflage their appearance.

NFC can either be mixed on-site for smaller areas or purchased from a reputable concrete supplier and trucked in for larger commercial applications. NFC is mixed at a 6:1 ratio by volume of 20mm max size clean aggregate and cement. Water content should be such that the cement slurry evenly coats the aggregate and retains a wet/glossy appearance without excess slurry running off, this is typically around 40 litres per 100kg of cement. With the use of NFC, we are able to build Block Retaining Walls in areas and situations where normal construction methods would not work. Some of these situations are: In areas where excavation behind the wall is limited either due to being on a boundary or close to other structures or footings. See extra information on https://stormheart.net/.