Ledgestone retaining wall repair company in Colorado: How wide should a retaining wall trench be? The trench you are going to build your retaining wall in should be wide, deep, and level. Size the trench so there’s enough room for the block and at least 8 inches of space behind it. Excavate deep enough to completely bury at least one full course, including space for 6 to 8 inches of base material. Establish a level trench to ensure an even layer of base material. That will help prevent the wall from tipping after freeze/thaw cycles. Our experts use a laser level and a story pole to determine the depth of the trench.

First of all, what is No Fines Concrete (NFC)? Basically it is just what the name suggests, concrete without any fine aggregates or sand. It consists of generally an aggregate (gravel), cement and water. The aggregate is coated with the cement slurry binding it together, it dries with the strength of concrete but with voids or air pockets. This makes the NFC light weight and allows water to pass through its honeycomb texture.

We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery. Find additional information at Building and repair of retaining walls Colorado.

After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms.

A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.