Excellent pill stamp press manufacturer: Usually, the movement or activity of personnel should be reduced as much as possible in the laboratory, and the door of the clean room should be closed or automatic door closers should be installed to keep it closed. Stop use immediately when the cleanliness does not meet the requirements: When the cleanliness does not meet the requirements, it should be stopped immediately, find the cause, thoroughly clean, must be verified by the cleanliness and meet the requirements, and then use again, and record the situation in the aseptic room use register, regular archival storage. Guidance and supervision of incoming foreign personnel or maintenance personnel: non-microbial room inspection personnel shall not enter the clean room (aseptic room), and foreign personnel or maintenance personnel who must enter shall be guided and supervised. Read extra info at pharma clean room.

Tablet press is mainly used for tablet technology research in pharmaceutical industry. The tablet pressing machine presses powder or granular raw materials into tablets. Its scope of application: Traditional Chinese medicine, western medicine, health products, food, chemical industry, electronics and other industries. The prefabricated container house is a new concept of environmentally friendly and economical house with light steel H-shaped steel and channel steel as the framework, sandwich panel as the wallboard material, space combination with standard modulus series, and bolted or welded components.

Because of the different standards and machine styles, the die of tablet press can be divided into single tablet press die and rotary tablet press die. According to different specifications, diameter and tablet shape, the stamping dies of single stamping tablet machine and rotary tablet press can be divided into circular stamping dies and special-shaped stamping dies (triangle, oval, key type, plum blossom, rectangle, etc.), which can be customized according to your needs.

In summary, maintaining the right humidity level in clean rooms is vital for ensuring their effectiveness and longevity. By understanding the normal humidity range for clean rooms (between 40% and 60% RH) and implementing proper cleanroom humidity control techniques such as using a dehumidifier, hygrometer, proper ventilation, and controlling water sources, professionals can help create a controlled environment that promotes optimal performance and safety.

The plane and space design of the clean laboratory will arrange the clean experimental area and personnel purification, equipment and material purification and other auxiliary rooms in different areas. At the same time, the comprehensive coordination effects of various technical facilities, such as experimental operation, process equipment installation and maintenance, air distribution type, pipeline layout and purified air conditioning system, are considered.

For the tuyere equipped with filter, the auxiliary air duct can be selected according to the tuyere form, that is, the straight pipe section with the same section as the tuyere and the length equal to twice the side length of the tuyere is made of hard plate, which is connected to the outside of the filter tuyere. The measuring points are evenly arranged on the outlet plane of the auxiliary air duct according to the minimum number of measuring points, and the wind speed of each point is measured with a hot ball anemometer. The air volume is determined by multiplying the average wind speed at the section of the air outlet by the net section area of the air outlet.

What is the purpose of the clean room test of the clean workshop? Most of the owners are based on the original vision of the purification project to complete the test indicators. Of course, this is the most straightforward goal and method. After all, our intention to build a clean room is also As such, there is a need to achieve our air cleanliness. In a single-flow type clean room, the location of the wind speed measurement can be specified by the owner, usually on the surface of the filter screen or at the working height. However, it should be noted that it is the air velocity measurement of the filter screen (the surface of the filter screen) or the indoor air velocity measurement of the clean room (working height). Clean workshop, clean room, clean room — the purpose of clean workshop and clean room test. Read even more information at sz-pharma.com.

Clean room in pharmaceutical industry manufacturer today: Today (Suzhou Pharma Machinery Co., Ltd.) will introduce to you, clean room airflow and influencing factors. There are many factors affecting the airflow in the clean room, such as process equipment, personnel, clean room assembly materials, lighting fixtures, etc. At the same time, the distribution point of airflow above the production equipment should also be considered.

The clean room is generally made of foam color steel or rock wool board with a vertical wall and an independent air-conditioning air supply system. The air is filtered through high-efficiency three-stage filtration in junior high schools. The personnel and materials are equipped with an air shower room and a transfer window for clean filtration.